Thursday, June 5, 2008

SAP Production Standard Reports

No Report Selection Criterion T Code Description Area
1 Bill of Materials Material
Plant
BOM Usage
Alternative BOM
Change Number
Valid From
Valid to
Revision Level
Required Quantity

CS03
CS09
CS15
CS14
CS12
CS11

Responsible for giving information related to Bill of Materials. Comparison of BOM between two Materials. Production
2 Work Center Information System

Work center     
Plant           
Work center cat.
Person responsible
Capacity category
Capacity planner
Name of hierarch
Plant          
Controlling area
Cost center  

CR60
CR05
In this report Machines used for manufacturing are displayed. Labor work center is also displayed. Production
3 Operation Analysis Dates Selection

Plant           
Work center     
Material        
Order           
Operation/Activity
Date
Exception

MCPB
MCPY
MCPK
MCPQ

This report is used to extract the information of operation quantity, scrap quantity, lead time, target lead time. Production
4 Material Analysis

Plant            
MRP controller   
Material
Month
Exception

MCPW
MCPF
MCPO
MC89

Used to give information of target against actual lead time. Planned ordered quantity against actual ordered quantity. Planned cost against actual cost. Production
5 Operation Analysis: Selection

Plant              
Work center        
Material           
Order              
Operation/Activity 

MCP1
MCP3
MCP5
MCPB
MCPU
MCPW

The order information system is a tool for shop floor control with a reporting function for production orders and planned orders. These reports are useful in discreet manufacturing set up.

Production