Monday, June 16, 2008

Standard Reports in SAP Production Planning

Standard Reports in SAP Production Planning

Find Below a list of Standard Reports in SAP PP.

No Report Selection Screen Transaction Description Area
1 KanBan Analysis1

Plant          
Supply area    
Storage location
Material       
Responsible
Date
Analysis   

MCQ. This report gives information of KanBan usage. This can be used only when KanBan Component is used. PP
2 KanBan Analysis 2
KanBan Board Demand Source Overview
No. Area Selection
Supply Area
SAreas For Period
Supply Areas for Storage Location
Material
PK11
PK12
PK13
PK18
This report gives information of KanBan usage. This can be used only when KanBan Component is used. PP
3 Material Usage Analysis

Plant        
Material     
Component    
Order 
Date
Analysis Currency
Exception

       

MCRE

This report can be used for analyzing the actual material usage against plan in manufacturing process.

PP
4 Product Cost Analysis Selection

Plant        
Material     
Component    
Activity type
Order        
Date
Analysis Currency
Exception

MCRI

This report can be used for finding out planned cost vs. actual cost in the manufacturing process

PP
5

Missing Parts Info System

Plant                   
Material                
MRP controller          
Requirements date       
WBS element             
Sales order 
Material                     Order                        MRP controller              
Production scheduler        
WBS element                 
Sales order                 

CO24 Missing Part List Check PP